Smart Building Model

Glossary : Model

Term - Open-Transition Transfer link

Properties
Name Value
Description

OTT completely disconnects the primary power before connecting the secondary power. This is called "break-before-make" transfer. This causes interruption in the power input, which can last from a fraction of a second to multiple seconds. During this period, the system loads can be supported by power from a UPS.

Transit From
Name
 Open-Transition Transfer : Block
Created By Unspecified

Appears In
Diagram
Smart Building Model